|
浙江华为UPS总代理浙江华为UPS总代理浙江华为UPS电源总代理 数据便捷服务(GDSExpressServices)以基础服务(标准机柜托管服务)、可选服务(在机柜托管服务基础上添加定制化选择)和互联网接入服务三大类服务产品形成专业的便捷服务体系菜单,围绕为客户提供“简便”、“快捷”的服务体验,以客户为中心集成了“标准化”,“简明化”,“及时化”,“高效化”的“四化”数据中心服务解决方案。 Data Convenience Services (GDSExPress Services) forms a professional convenient service system menu with three types of service products: basic service (standard cabinet hosting service), optional service (adding customized selection on the basis of cabinet hosting service) and Internet access service. It provides customers with "simple" and "fast" service experience. Customer-centric integration of the "standardized", "concise", "timely", "efficient" of the "four" data center service solutions. Standardization: Integrating twelve years of professional high-availability IT service management experience, intelligent city cloud room construction, relying on high-standard data center resources, providing standardized product specifications and service processes for small and medium-sized common needs, with the "McDonald's" model to launch a customizable choice of service menu; Conciseness: Provide transparent and detailed service content and price, simplify service opening and support process around customer needs, reduce the complexity and deployment difficulty of customer IT projects; Timeliness: including rapid service opening and service deployment, timely response to customer technical problems, fault maintenance, changes and emergency events; Efficiency: Rapid deployment of service capabilities to help customers complete the relocation at the fastest speed; and from service opening to after-sales operation and maintenance, provide end-to-end single user service interface, with a unified national platform-level standard service support team (Customer Support Center), support customers to carry bags into the city of wisdom The budget of the cloud machine room simplifies the service process and realizes the convenient and efficient communication with customers. 1. Computer room decoration system 1 computer room decoration design requirements A. The interior decoration of the main engine room should be made of materials with good air tightness, no dust and easy cleaning, which are not easy to deform under the action of temperature and humidity changes, and should meet the following requirements: A) the walls and ceiling surfaces should be leveled to reduce the dirt surface and avoid glare. For plastering, it should meet the requirements of advanced plastering. B) flooring should be laid. The movable floor should meet the requirements of the current national standard "technical floor conditions for computer rooms". C) floor and four wall decoration under movable floor, with cement mortar plastering. The floor material is smooth and wear-resistant. When the space under the movable floor is a static pressure box, the four walls and the ground should be chosen not dust, not easy to dust, easy to clean facing materials. D) The ceiling should be made of dust-proof sound-absorbing materials, such as above the ceiling and when used for laying pipelines, the four walls should be plastered, and the floor bottom should be cleaned up; when the space above the ceiling is a static pressure box, the top and four walls should be plastered, and dust-proof treatment should be carried out, and other pipe finishes should also be made of dust-proof materials. The interior decoration of B. workshops and the first class auxiliary rooms should be made of materials that are not dust and easy to clean. The walls and ceiling surfaces should be leveled to reduce the dust accumulation. Decorative materials can be taken according to the need for anti-static measures. Ground materials should be leveled, wear resistant and easy to dust. C. Sealing measures should be taken at the joints of the inner doors, observation windows and pipelines through the walls of the main engine room and the working room. The interior tone of D. computer room should be elegant and soft. E. When the main engine room and the working room are equipped with external windows, it is advisable to use double metal closed windows, and avoid direct sunlight. When using aluminum alloy windows, single layer closed windows can be used, but glass should be hollow glass. F. when the main engine room is equipped with water equipment, effective measures should be taken to prevent overflow and leakage of water supply and drainage. 2 decoration design plan 2.1 ground The main floor material of computer room is movable floor. The movable floor has become one of the indispensable facilities in modern computer room. It can be used to form an underground space structure in computer room. The movable floor is used for installing various kinds of computer equipment, while the space under the movable floor is provided with strong and weak electric bridge, copper net and electric pipeline, which can be used for laying various power supply and signal pipeline of connecting equipment, and the floor spring socket installed on the static floor is used as the power supply for the equipment of the computer room, and it can also be used for air conditioning and air supply. In addition, the movable floor can be installed and disassembled quickly to facilitate the layout and adjustment of the equipment. The above floor has heavy load capacity and is not easy to deform. The floor performance conforms to the technical requirements of the movable floor for the computer room. All scaffolds are made of high quality steel to ensure the structure of the platform is stable and fireproof. 2.1.1 floor installation requirements 2.1.1.1 requirements for laying grounds The laying of floors should be carried out after completion of indoor civil engineering and decoration works. The floor should be neat, clean, dry, sundry, and free from dust. Underfloor usable space, laying cables, electrical appliances, water, air and other pipelines and air conditioning system should be installed before the floor construction; The base of heavy equipment should be fixed and installed on the base. The height of the base should be the same as that of the upper surface of the floor. The construction site is equipped with 220V/50HZ power supply and water source. 2.1.1.2 floor installation and laying tools Professional cutting saw; Laser level detector and network laser scanner; Bubble level, tape measure, ink line; Suction plate, nut adjusting wrench, cross screwdriver; Vacuum cleaner, broom and mop. 2.1.1.3 construction steps Carefully check the surface smoothness and wall verticality, if there is a major defect or need for local renovation, should be submitted to the relevant departments of Party A; Pull the horizontal line and apply the floor height to the wall with ink. 浙江华为UPS总代理浙江华为UPS电源总代理 上一篇福建华为UPS总代理下一篇安徽华为UPS总代理 |